Skip to main content
Hilton Hotel BWI Airport

Owned by Distributed Sun’s Solar Energy Investment Company (SEIC), sunONE, the solar system at Hilton Hotel BWI Airport generates nearly 60 megawatt hours of electric power per year, and over 2 gigawatt hours over its lifetime. The solar power from Distributed Sun costs the Hilton less per kilowatt hour generated than the electricity it buys from the grid, and under contract terms that guarantee savings for property manager PMHS to grow each year, compounding for 20 years.

Details

Location
Baltimore, MD
Project type
Commercial & Industrial (C&I) solar
Project Capacity
52 kW DC
Annual Electricity Generation
69 MWh
CO2 Avoided to Date
375 metric tons
Commissioning date
October 21, 2010